Home    Company News    Anti-mildew

Anti-mildew

Hits: 935 img

In daily life, all kinds of home-made molds and water leaks are plaguing the broad masses of the people. How to prevent mildew and water leakage, today is a special adhesive product for anti-mildew and water-proofing.
Sewing is a one-component fast curing MS sealant with good mold resistance and long-lasting elasticity. Non-mildew, grade 0 mildew proof, suitable for joint sealing in home kitchen and bathroom facilities. Easy to extrude, easy to construct, good adhesion to most substrates in the home, can be repaired twice. Green and environmentally friendly, no pollution to the substrate, no corrosion. Excellent puncture resistance, aging resistance and oil resistance.

Product advantages 
1. The surface is bright, hard as porcelain, and has good abrasion resistance;
2. Easy to wipe, good mold and stain resistance;
3. Good aging resistance, no yellowing;
4. Good adhesion to substrates such as metal, ceramics and marble;
5. Green and environmentally friendly, no pollution to the substrate, no corrosion.

Scope of application

1. Between doors and windows and walls, high-grade sanitary ware, kitchen utensils, shower room, bathtub, tile construction, home improvement glass, high-grade furniture, various floors, etc.
2. The interior decoration structure is sealed, and the ground structure joint is waterproof and sealed;
3. Seal the joint between the plasterboards of the interior ceiling or between the wood splints.

how to use 

1. Cleaning of the adhesive surface: the surface of the bonded substrate must be clean and dry, free of dust, oil and water stains;
2. Adhesive tape: In order to prevent the sealant from contaminating the non-construction part, put protective tape on both sides of the gluing part before sizing;
3. Ambient temperature and humidity have a great influence on the surface and curing of sealant. It is recommended that the construction environment temperature be 5 ~ 35 ° C, humidity 50 ~ 70% RH;
4. Glue: Use a blade to cut the rubber mouth horizontally. The size of the nozzle depends on the rubber, so that the nozzle touches the surface to be adhered as much as possible. The sealant is uniformly and continuously extruded from the glue injection nozzle, and the nozzle should be moved evenly and slowly to ensure that the adhesive base is in full contact with the sealant, and the bubble or cavity generated by the nozzle to move too fast and discontinuous is prevented;
5. Modification: The gel is modified before the glue is dry. The usual method is to scrape off the excess glue outside the interface with a special scraper, and at the same time modify the interface surface into a flat surface;
6. Remove the protective tape: Remove the temporary protective tape immediately after the modification operation;
7. After curing and curing to the best bonding strength time, 3 to 5 days in summer and 5 to 7 days in winter.

Online QQ Service, Click here

QQ Service

Wechat Service