Silicone waterproofing agent construction precautions
Hits: 700
img
Precautions
1. Store this product in a sealed and closed light. After each use, the packaging should be sealed to avoid failure, and it should be used up within 72 hours after opening.
2. Before use, apply an application test to each surface to be treated, and observe the results at least 24 hours later.
3. Suitable environment temperature is 10 ℃ ~ 40 ℃, humidity is 50% ~ 80%.
4. High acid environment is not conducive to product curing. If the substrate is cleaned with an acidic cleaning agent, the residual acid must be neutralized with sodium carbonate solution to neutrality.
5. The contact and cleaning of any harsh chemicals may affect its effective life.
6. During the construction process, the construction personnel should wear goggles and protective gloves as required. If inhaled, move to fresh air immediately. If contact with skin, wash immediately with water for 15min; accidentally contact eyes, wash immediately with water for 15min, and take off contaminated clothes and shoes and seek medical treatment in time.
Different silicone protective agents have different construction requirements. Before construction, a practical construction plan should be formulated according to the instructions of the protective agent used and the actual situation on site.